In a data center a number of servers and connected machines are linked to one another with the help of a network.  This network is an indispensable component of any data center and any problem in the network can hamper the function of your data center very badly.  The productivity and performance of your data center depends on the quality and pattern of networking.

Thus before taking a decision on shifting your information center you need to check the availability of existing networking facilities at the new location.  The data center network should be capable to support your PCs.  Heavy flow of data can clog up the networks and thus a couple of tests like load tests should be run and latency issues should be checked before arriving at a call.

Nowadays most businesses interact with their clients through online activities.  This further emphasizes the need for having a strong network.  Generally before installing a data center a new network frame is created and connected to the existing network.  If your networking requirements are very large this can be an astounding effort.

Procuring and erecting different parts of network for your new information center is a time taking and exhausting process.  Therefore when you have selected the location for your new info center you need to start the process and that too in tandem with the vendors to overcome this issue.  The target should be to established the whole data center network before you initiate the process of dismantling and packing the components of your old data center.

Making your network circuit alive, also know as circuit-turn up is a time taking process.  In certain cases it takes as long as ninety days or even more for Telco turn up for circuit.  This means that your networking efforts at the new location should start at least three months before you actually initiate the moving process.  The likely defects arising during installation of networks are erratic configuration of CSU/DSU, the router not being LMI enabled, defective CSU/DSU, defective installation of the link between the existing system and the local Telco switch etc.  These can stall your move to the new location.  Therefore the efforts for integrating the existing network with the external communication channels should start as soon as you finalize the new place for your data center.

Tagged with:
Mar 08

Data center relocation occurs when the present site isn’t really enough to accommodate all the technology advances and the equipments associated with them such as power systems and its backups, air-con systems, PC systems, facilities for storage, arrangements for telecommunication etc .  These are the basic functionalities of every info center.  When the current spot isn’t adequate to lodge all the growing wishes and technical advances of the info center then you want to consider shifting your complete information center to a new location.  Therefore you can shift your complete site to a new place.

Moving a data center is not similar to moving a home or household possessions. To pack up, transport and install all the systems to the new location you need to make up a team of hardware engineers, electrical professionals, data centre architects and a general contractor to monitor all activities including the paper works and other documentation matters.

You’ve got to ensure that all the pro members concerned in the moving project should similarly contribute their best attempts to produce maximum fabulous results to the work though the method is time consuming.  There should be adequate security and power supply systems at the new edifice in accommodating data center relocation.  For at least another ten years the new center should serve you before it out grows the current wants.

The IT equipment migration team would assist you in the designing of the new data center, installing all computer and backup systems and moving all software and data in an efficient manner.

Bi-weekly team review meetings are to be conducted in order to ensure the progress achieved by the team in the migration project. This will be helpful in speeding up the process of relocation. You can also keep a status history to check the progress in each job assigned on individuals. Thus, you can complete your project within a specified period.